
Shotcrete Machine Feature:
1.Non-adhesion going-through rotor with new material chamber, completely eliminate bonding and blocking during operation so as to reduce clearance and maintenance period.
2.Thin flow conveying method with vortex flow, so the spraying flow is even, continuous and steady, to improve the shotcrete quality.
3.Four-point clamping device make it easy to adjust the press between sealing plate and rotor disk so as to no air and dusk leak and prolong consumption parts life.
Main Parameter:
PZ Model (dry-type) shotcrete machine | |||
Model | PZ-3 | PZ-5 | PZ-7 |
Capacity (m3/h) | 3.5 | 5 | 7 |
Max. Conveying Distance (Horizontal,Vertical m) | 200,20 | 200,20 | 200,20 |
Use material ratio(Cement/Sand) | 2001-3-5 | 2001-3-5 | 2001-3-5 |
Use material water-cement ratio | ≤0.4 | ≤0.4 | ≤0.4 |
Max. Aggregate Diameters (mm) | 20 | 20 | 20 |
Feeding pipe inner diameters(mm) | 38 | 51 | 64 |
Rotor Diameter(mm) | 350 | 438 | 480 |
Working pressure (MPa) | 0.4-0.6 | 0.4-0.6 | 0.4-0.6 |
Air consumption (m3/min) | 3-4 | 7-8 | 8-10 |
Motor Model | Y112M-6-3KW | Y132-6-5.5KW | Y132-6-7.5KW |
Voltage(V) | 380,660,etc | 380,660,etc | 380,660,etc |
Overall size (mm) | 1040*550*940 | 1280*700*1280 | 1500*700*1280 |
Overall weight (kg) | 260 | 600 | 700 |


A: We are honored to offer you samples for quality check.
2. Q: Do you have the products of concrete shotcrete machine in stock?
A : No. All bikes are to be produced according to your order including samples.
3. Q: What's the delivery time?
A: It usually takes about 10-15 working days to produce an order from MOQ to 40HQ container. But the exact delivery time might be different for different orders or at different time.
4. Q: Can I mix different models of gunite shotcrete machine in one container?
A: Yes, different models can be mixed in one container, but the quantity of each model should not be less than MOQ.
5. Q: How does your factory do regarding quality control?
A: Quality is priority. Highper People always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it's packed for shipment.

